ServicesBathroom Remodeling
Murphy, TX Bathroom Remodeling
When a bathroom needs it, we take it down to the studs and rebuild: shower, tub, vanity, lights and fan. The parts that decide how long a bathroom lasts are hidden behind the finished surface, so that is where we put our effort. Give us a call to set up a free estimate at your home.

What a bathroom remodel covers
A bathroom remodel replaces the parts of the room you use every day: the shower or tub, the vanity and sink, the toilet, the lights and the fan. Sometimes it is a simple swap. Other times we move the shower, widen a doorway or turn an old tub into a walk-in shower.
Water is the hard part. A shower that looks fine on day one can leak into the subfloor within a few years if the pan is flat, the membrane has a gap or the valve is set at the wrong depth. We build those layers slowly and check them before anything gets covered up.
We are licensed and insured, with 10 years of experience. You get one crew from demo to cleanup, and one person to ask when something comes up.
What the work includes
- Careful demolition
- We cover floors and hallways, set up dust barriers and take the old room down to what needs replacing. Debris goes out the same day it comes off the wall.
- Shower pan and waterproofing
- Shower floors get a real slope to the drain, about a quarter inch per foot. The walls get a continuous waterproof membrane, with corners, niches and valve openings sealed before tile goes on. We flood test the pan so you know it holds water.
- Plumbing and valve placement
- We set valves, drains and supply lines to the right depth and height for the fixtures you pick. Shutoffs stay reachable, so a future repair does not mean tearing out a wall.
- Ventilation that actually vents
- The exhaust fan gets ducted all the way outside, not dumped into the attic. A fan sized for the room keeps moisture off the ceiling and out of the grout.
- Vanity, fixtures and lighting
- We level and anchor the vanity, set the toilet on a solid flange and wire new lights and outlets with GFCI protection near water.
When it is time to redo your bathroom
A spongy floor by the toilet or tub
If the floor flexes when you step on it, water has likely gotten into the subfloor. The damage will keep growing until the leak is stopped.
Grout and caulk that darken again fast
When dark lines come back days after cleaning, the moisture is often trapped behind the tile rather than sitting on the surface.
Ceiling paint peeling or a musty odor
Both usually mean the exhaust fan is too weak or missing. Damp air that cannot escape soaks into the drywall and the framing.
A tub that just sits there
Lots of Murphy homes were built with big garden tubs that rarely get used. Replacing one with a spacious walk-in shower is among our most frequent jobs.
Cracked shower walls or tile that moves
Tile that sounds hollow or shifts when pressed often means the backer behind it has failed. Patches seldom hold for long.
What moves the price
Every bathroom is priced on its own, and we write the estimate line by line so you can see where the money goes. Two rooms the same size can come out very differently. These are the things that make the biggest difference.
Keeping or moving the layout
Leaving the shower, toilet and sink where they are costs less. Moving a drain means opening the floor, and on a slab foundation that can mean cutting concrete.
Tub to shower conversions
Removing a tub and building a walk-in shower adds pan work, waterproofing and often new glass.
What we find underneath
Rotted subfloor, old leaks or outdated wiring add work. If we find it, we show you photos and price it before we fix it.
Fixtures and finishes
The shower valve, vanity, glass and surface materials you choose vary widely. We can price a couple of options side by side.
How your bathroom project moves along
- 1
A no-cost estimate at your house
We walk the bathroom, check under the vanity and around the tub, and listen to your ideas. You then get a written estimate broken into items, so the cost of each part is clear.
- 2
Plan, fixtures and permits
We settle the layout and fixture choices with you before work starts. When plumbing gets moved or circuits get added, we file for the permit and arrange the inspections.
- 3
Behind-the-wall work goes in first
Framing repairs, plumbing, wiring, the shower pan and waterproofing come before anything else. We send photos at each stage, since all of it ends up hidden.
- 4
Final touches and a walk-through
Surfaces, fixtures and trim go in at the end. We walk the room with you, run every faucet and the fan, clean up and haul off what is left.

Bathroom remodeling questions
How long will my bathroom be out of service?
A straight swap of fixtures can take about a week. A full remodel with a new shower usually runs longer because waterproofing and inspections need time. We give you a schedule with the estimate and tell you right away if something changes it.
Do I need a permit for a bathroom remodel?
Cosmetic updates often do not. Moving plumbing, adding circuits or changing the fan usually do. When a permit is needed, we pull it and handle the inspections.
Why do you flood test the shower pan?
It is the only way to know the pan holds water before tile covers it. We plug the drain, fill the pan and leave it for a set time. If the level drops, we fix it now instead of after a leak shows up downstairs.
Can we keep using the house while you work?
Yes. We seal off the bathroom with dust barriers, protect the path to the door and clean up each day. If it is your only shower, tell us at the estimate and we will plan around it.
What happens if you find water damage behind the wall?
We stop and show you. You get photos of what we found and a price to fix it before any of that work starts. Nothing gets added to the bill without your okay.

Let's look at your bathroom
We will come out, check what is behind the surface and tell you plainly what the room needs. The estimate is free.