Skip to content

10 years of experience, licensed and insured. Free estimates: (972) 325-2877

(972) 325-2877

ServicesKitchen Remodeling

Kitchen Remodeling in Murphy, TX

We remodel kitchens with the most care on the parts you will never see again: shutoff valves, drain slope, dedicated circuits and a range hood vented outside the right way. That hidden work decides how the room holds up. You get a clear plan and a written estimate first.

Two workers in gray T-shirts carry an unfinished shaker base cabinet through a kitchen with paper-covered floors, plastic-draped counters, a drill, level and clamps

A kitchen that still works right in year five

A kitchen takes a beating every day. Water at the sink, heat at the range, steam and grease in the air. Almost any remodel looks good the week it is done. How it looks five years later comes down to the work behind the walls and under the sink.

That is where we put our time. We are licensed and insured, with 10 years of experience. We also do roofing, and roof work teaches you one thing fast: small details decide whether water stays where it belongs. We bring that habit inside. Check what is there, fix what is underneath, then build.

Kitchen remodeling is the right call when the room no longer fits how you cook, when old plumbing or wiring is overdue, or when you are tired of patching the same problem twice.

What your kitchen remodel covers

Planning the layout
We measure the kitchen and locate where water, gas and power enter. Then we go over what you'd like to change. Shifting a sink a few feet is very different from moving it across a slab foundation, and you'll know that before work begins.
Tidy demolition
First we shut off and cap the utilities. Runners go down on walkways, dust barriers go up at doorways, and old material leaves the house as we work.
Plumbing built to hold up
Fresh supply lines with quarter-turn shutoffs, a properly sloped drain, and the right high loop or air gap for the dishwasher. We turn the water on and look for leaks before anything is closed in.
Wiring and lights
Each appliance gets its own dedicated circuit where it needs one. Outlets by the sink get GFCI protection. We put light over the spots where you prep, and the wiring is inspected before it gets covered.
Hood ducted to the outside
A hood that blows into the attic only sends grease and moisture somewhere worse. We duct it outdoors and flash and seal the cap where it goes through the roof or wall. That is roof work, and we do it like roof work.
Final fitting and walk-through
We level the appliances, seal the gaps around the sink and go through the kitchen with you before we finish.

Signs your kitchen is ready for a remodel

  • Water damage under the sink

    Warped bottoms, a musty smell or a soft spot near the dishwasher means water has been getting out for a while. The fix usually goes past one fitting.

  • Breakers trip when you cook

    If the microwave and toaster cannot run at the same time, the kitchen is short on circuits. That gets worse as you add appliances.

  • Steam and grease hang in the air

    A weak hood or one vented into the attic leaves a film on everything. It can also put moisture where you do not want it.

  • A ceiling stain near the hood

    A stain around the vent line often points to a poorly flashed roof cap. We check it from both sides.

  • The layout fights you

    No landing space by the stove, a fridge door that blocks the walkway, too few outlets where you work. Small daily annoyances add up.

How a kitchen remodel runs with us

  1. 1

    Free estimate at your home

    We look at the room, open the sink base, check the panel and look at how the hood vents. You get an honest read on what is worth changing and what is fine as is.

  2. 2

    Written plan and permit

    You get a written, line-item estimate and a plan for the order of work. We pull the permit when the job needs one.

  3. 3

    Tear-out and rough-in

    We protect your home, remove the old kitchen and run new plumbing, wiring and venting. If we find rot or bad wiring, we stop, show you photos and explain the options before going further.

  4. 4

    Inspection, then build-out

    The rough work gets inspected while it is still open. After it passes, we close up and install everything in the finished room.

  5. 5

    Walkthrough and cleanup

    We test every outlet, run every faucet and check the hood draw with you. The site is cleaned and the debris is gone when we leave.

Roofer and homeowner in a driveway viewing a tablet photo of damaged shingles, with a ladder against a brick home's partly stripped roof and tarps on the lawn

What affects the cost of your kitchen

Every kitchen begins in a different place, so we base the price on what we see in yours. Your written estimate splits the job into separate items so you know where your money is going. If anything changes after the walls are opened, we go over it with you before doing extra work.

Relocating plumbing in a slab
Leaving the sink in place is much cheaper than moving it. Moving a drain on a slab foundation means cutting the concrete and patching it.
Conditions inside the walls
Aging supply lines, an unnoticed leak or old wiring must be fixed before the new kitchen goes in.
Electrical service
New appliances can call for new circuits, and sometimes the panel needs upgrades to support them.
Where the hood duct runs
A short duct straight through an exterior wall is simpler than a long attic run out the roof with new flashing.
Your fixture and appliance picks
The sink, faucet, lights and appliances you choose affect both what materials cost and how long installation takes.

Common kitchen remodel questions

Something not covered here? (972) 325-2877

Will my kitchen remodel need a permit?

Usually, if the work touches plumbing, wiring or venting. We get the permit and book the inspections. The rough work is checked before it is closed in, which helps you when it is time to sell.

Can we stay home during the work?

Most families do. The kitchen will be out of use for a while, so many set up a coffee maker and microwave in another room. We let you know in advance which days water or power will be shut off.

Why does a roofing company do kitchens?

The same habits apply. Roofing is about sealing, flashing and sending water where it belongs, and a sink and range hood vent need that same attention. We also do the hood cap where it exits the roof, so one crew is responsible for the full vent run.

What if you uncover damage during tear-out?

We pause and show it to you. You get photos, a clear explanation and the extra cost in writing before we repair it. No added work happens without your approval.

Can my sink go in an island?

In many kitchens, yes. It takes new supply and drain lines, sometimes cutting into the slab, and the island drain has to be vented correctly. At the estimate we'll tell you if it suits your kitchen and what it adds to the cost.

How long does a kitchen remodel take?

That depends on the size of the job, how much plumbing and wiring changes, and when inspections can be booked. Your written estimate lays out a schedule for each phase, so you know what is happening each week.

Single-story brick ranch house with a dark brown architectural shingle roof, ladder at the garage eave, tarp on the lawn and shingle bundles in the driveway

Let's look at your kitchen together

We will check under the sink, at the panel and up at the hood vent, then give you a straight plan. If you are planning bathroom remodeling too, we can look at both on the same visit.